our
projects

Here you’ll find key data from projects where our solutions have improved soil stability and load-bearing capacity. By applying advanced foundation techniques and geotechnical innovations, we help enhance structural performance and efficiency across different applications.

 

ANCHORS FOR 60KM OF THE 500KV – ARGENTINA.
YEAR: 2005
Number of anchors: 150
  • Length of Tiebacks: 9 m.
  • Diameter of The Shaft: 0.15 m.
  • EB Diameter: 600 mm.
  • Service Load: 550 KN
SAVINGS
  • Cost: 60%
  • Time: 50%
underpinning – united states
year: 2021
Number of piles: 124
  • Length of Tiebacks: 9 m.
  • Diameter of The Shaft: 0.18 m.
  • EB Diameter: 600 mm.
  • Service Load: 900 KN
SAVINGS
  • Cost: 40%
  • Time: 50%
MICROPILES FOR WAREHOUSE – BRAZIL
YEAR: 2021
NUMBER OF PILES: 735
  • Length of Piles: 9 m – 11 m.
  • Diameter of The Shaft: 0.20 m.
  • EB Diameter: 600 mm.
  • Service Load: 1300 KN
 SAVINGS
  • Cost: 45%
  • Time: 55%
TANGENT PILE RETAINING WALL HOSPITAL – PERU.
YEAR: 2021
Number of anchors: 335
  • Length of Tiebacks: 12 m – 16M.
  • Diameter of The Shaft: 0.18 m.
  • EB Diameter: 600 mm.
  • Service Load: 650 KN
SAVINGS
  • Cost: 40%
  • Time: 35%
pile system commercial building
year: 2020
Number of piles: 125
  • Length of Piles: 9 m.
  • Diameter of The Shaft: 0.20 m.
  • EB Diameter: 600 mm.
  • Service Load: 900 KN
SAVINGS
  • Cost: 40%
  • Time: 50%
PILE SYSTEM RESIDENTIAL BUILDING – BRAZIL
YEAR: 2021
NUMBER OF PILES: 304
  • Length of Piles: 12 m.
  • Diameter of The Shaft: 0.40 m.
  • EB Diameter: 600 mm.
  • Service Load: 1000 KN
 SAVINGS
  • Cost: 30%
  • Time: 40%
URBAN VIADUCT –  BOLIVIA
YEAR: 2011
Number of piles: 256
  • Length of Piles: 16M.
  • Diameter of The Shaft: 0.45 m.
  • EB Diameter: 600 mm.
  • Service Load: 1300 KN
SAVINGS
  • Cost: 41%
  • Time: 58%
pile system commercial building – BOLIVIA
year: 2020
Number of piles: 406
  • Length of Piles: 26 m.
  • Diameter of The Shaft: 0.50 m.
  • EB Diameter: 800 mm.
  • Service Load: 2800 KN
SAVINGS
  • Cost: 32%
  • Time: 49%
smart cells SYSTEM urban bridge – bolivia
YEAR: 2021
NUMBER OF cells: 34
  • Service load by Project: 3.927 kN
  • Avg. Load Obtained: > 8.000kN.
  • Settlement by Project: 25mm
  • Settlement obtained: < 10mm 
 SAVINGS
  • Cost: 42%
  • Time: 50%