our
projects
Here you’ll find key data from projects where our solutions have improved soil stability and load-bearing capacity. By applying advanced foundation techniques and geotechnical innovations, we help enhance structural performance and efficiency across different applications.
ANCHORS FOR 60KM OF THE 500KV – ARGENTINA.
YEAR: 2005
Number of anchors: 150
- Length of Tiebacks: 9 m.
- Diameter of The Shaft: 0.15 m.
- EB Diameter: 600 mm.
- Service Load: 550 KN
SAVINGS
- Cost: 60%
- Time: 50%

underpinning – united states
year: 2021
Number of piles: 124
- Length of Tiebacks: 9 m.
- Diameter of The Shaft: 0.18 m.
- EB Diameter: 600 mm.
- Service Load: 900 KN
SAVINGS
- Cost: 40%
- Time: 50%
MICROPILES FOR WAREHOUSE – BRAZIL
YEAR: 2021
NUMBER OF PILES: 735
- Length of Piles: 9 m – 11 m.
- Diameter of The Shaft: 0.20 m.
- EB Diameter: 600 mm.
- Service Load: 1300 KN
SAVINGS
- Cost: 45%
- Time: 55%
TANGENT PILE RETAINING WALL HOSPITAL – PERU.
YEAR: 2021
Number of anchors: 335
- Length of Tiebacks: 12 m – 16M.
- Diameter of The Shaft: 0.18 m.
- EB Diameter: 600 mm.
- Service Load: 650 KN
SAVINGS
- Cost: 40%
- Time: 35%

pile system commercial building
year: 2020
Number of piles: 125
- Length of Piles: 9 m.
- Diameter of The Shaft: 0.20 m.
- EB Diameter: 600 mm.
- Service Load: 900 KN
SAVINGS
- Cost: 40%
- Time: 50%
PILE SYSTEM RESIDENTIAL BUILDING – BRAZIL
YEAR: 2021
NUMBER OF PILES: 304
- Length of Piles: 12 m.
- Diameter of The Shaft: 0.40 m.
- EB Diameter: 600 mm.
- Service Load: 1000 KN
SAVINGS
- Cost: 30%
- Time: 40%
URBAN VIADUCT – BOLIVIA
YEAR: 2011
Number of piles: 256
- Length of Piles: 16M.
- Diameter of The Shaft: 0.45 m.
- EB Diameter: 600 mm.
- Service Load: 1300 KN
SAVINGS
- Cost: 41%
- Time: 58%

pile system commercial building – BOLIVIA
year: 2020
Number of piles: 406
- Length of Piles: 26 m.
- Diameter of The Shaft: 0.50 m.
- EB Diameter: 800 mm.
- Service Load: 2800 KN
SAVINGS
- Cost: 32%
- Time: 49%
smart cells SYSTEM urban bridge – bolivia
YEAR: 2021
NUMBER OF cells: 34
- Service load by Project: 3.927 kN
- Avg. Load Obtained: > 8.000kN.
- Settlement by Project: 25mm
- Settlement obtained: < 10mm
SAVINGS
- Cost: 42%
- Time: 50%